Why Is a P7/Administration Building Needed at New Covenant Christian School?
The final grade level, Primary 7, still needs to be built; when it is completed, New Covenant Christian School will have 3 levels of nursery (preschool) and a complete primary (elementary) school. By combining this final level of the school with the administrative offices, the building needs of the school can be met in a financially responsible way that meets governmental requirements. (The current admin needs are being met in a primitive, rough-hewn building with dirt floors and no shelves or cabinets to speak of. Governmental codes are not being met.) The P7/Admin building will be constructed using the same building design as on the rest of campus, including masonry walls, concrete floor, windows with security grills, and locking metal doors. This building will house the oldest students; those who are preparing for the exam to enter secondary school, offices, testing, and records.